Impact windows · Coral Gables, FL
Impact windows in Coral Gables, through the Board of Architects.
Exterior work in Coral Gables — windows and doors included — goes to the city’s Board of Architects for review and approval before the Building Division checks it for code compliance. Plan for two approvals in sequence, not one permit, and note that both look at the same configuration you choose in the builder.
What the building code means in Coral Gables
Coral Gables is in Miami-Dade County, inside the High-Velocity Hurricane Zone where the modern impact standard was written. Replacement windows and doors must carry approvals rated for the HVHZ and the work requires a permit; on top of that, the city routes exterior work through the Board of Architects first, and only then to the Building Division. Approval documents are verified per product and configuration during review.
Miami-Dade County · High-Velocity Hurricane Zone (HVHZ)
Coral Gables at a glance
Permit office
- Jurisdiction
- City-run (Coral Gables issues its own permits)
- Permit office
- Development Services Department (Building Division)
- Address
- 427 Biltmore Way, Coral Gables, FL 33134
- Phone
- (305) 460-5245
- Online permits
- Building Permits Self-Service Portal (Tyler EnerGov CSS)
Hurricane zone and wind
- Hurricane zone
- Inside the High-Velocity Hurricane Zone (all of Miami-Dade County)
- Design wind speed, Risk Category II
- 175 mph (Florida Building Code 2023, §1620.2)
Housing in Coral Gables (Census estimate)
- Median year built
- 1968
- Housing units
- 21,906
- Built before 2000
- 16,745 units (76.4%)
- Owner-occupied
- 63.9% of 18,941 occupied units
In Coral Gables, about 8 in 10 housing units date from before 2000 (76.4%), against 77.2% across Miami-Dade County; median year built is 1968 here and 1980 county-wide. Of the 11 Miami-Dade County cities covered on this site, Coral Gables is 6th by share of housing built before 2000. Every unit built before 2000 predates the first statewide code, in force from March 1, 2002.
| Built | Units | Share |
|---|---|---|
| 2020 or later | 291 | 1% |
| 2010 to 2019 | 2,174 | 10% |
| 2000 to 2009 | 2,696 | 12% |
| 1990 to 1999 | 1,476 | 7% |
| 1980 to 1989 | 1,610 | 7% |
| 1970 to 1979 | 2,153 | 10% |
| 1960 to 1969 | 3,280 | 15% |
| 1950 to 1959 | 3,965 | 18% |
| 1940 to 1949 | 1,630 | 7% |
| 1939 or earlier | 2,631 | 12% |
Areas named on the official Coral Gables government site
- Areas
- French Normandy Village, Chinese Village, Dutch South African Village, Italian Village and Santa Maria Street Historic District
Flood insurance community
- NFIP community
- City of Coral Gables — 120639
- Community Rating System class
- 5
Local considerations
Because the Board weighs the appearance of exterior work, frame color, finish and grid layout are not afterthoughts here — they are part of what gets approved. Made-to-order manufacturing is what lets those choices be made deliberately and previewed before anything is ordered, and it is what accommodates openings that fall outside standard sizing.
Choose the right project path
For material-only supply, you provide the opening sizes used for manufacturing; professional measurement is not included. For installed projects, the measurements you enter start the review and professional measurement confirms the openings before ordering.
Coral Gables questions
Where do I get a window replacement permit in Coral Gables?
From the city’s own office: Development Services Department (Building Division), 427 Biltmore Way, Coral Gables, FL 33134, (305) 460-5245. Online: Building Permits Self-Service Portal (Tyler EnerGov CSS).
Is Coral Gables in the High-Velocity Hurricane Zone?
Yes. The Florida Building Code defines the zone as Broward and Miami-Dade counties, and Coral Gables is in Miami-Dade County. Risk Category II design wind speed for Coral Gables: 175 mph.
What does the age of Coral Gables housing mean for a window replacement?
76.4% of housing units in Coral Gables were built before 2000, so their original openings predate the March 1, 2002 statewide code. A replacement is permitted under the code in force when the permit is issued.
Sources for Coral Gables
- Florida Building Commission — Florida Building Code (official portal)
- Miami-Dade County — windows, shutters and doors: permit submittal and Notice of Acceptance
- City of Coral Gables — Board of Architects review of exterior work
Sources for the Coral Gables facts above
- City of Coral Gables — building services
- City of Coral Gables — building department
- City of Coral Gables — online permits page
- Florida Building Code 2023 (8th Edition), Building, Section 202
- Florida Building Code 2023 (8th Edition), Building, Section 1620.2
- U.S. Census Bureau, ACS 2023 5-year, tables B25001, B25003, B25034, B25035 — Coral Gables city, Florida
- Florida Building Commission — 2004 report to the Legislature
- U.S. Census Bureau, ACS 2023 5-year, tables B25001, B25003, B25034, B25035 — Miami-Dade County, Florida
- City of Coral Gables — page naming local areas
- FEMA — Community Status Book, Florida
Read on 2026-10-16. Census figures are survey estimates (ACS 5-year), not a count.
How Coral Gables compares with the other South Florida cities: South Florida housing age and hurricane history study
Building code, permitting and association rules change, and local requirements vary by jurisdiction. The authorities above govern; this page is general information, not legal advice. Confirm your own project with your building department and, where one governs your property, your association.