Material only
Impact windows and doors, supply only. You run the job.
For contractors, builders and experienced owners who install themselves: you build the project with your confirmed sizes, a specialist checks the specification, and the material is manufactured to those sizes and shipped anywhere in Florida by UPS or freight carrier. No installation, no site visit, and the permit stays with whoever does the work.
Your measurements
Material-only orders are built to the sizes you provide. That responsibility is stated clearly up front — not buried in fine print after a problem.
Spec verification
Sizes are checked against documented manufacturing limits, and a specialist confirms configuration details with you before anything goes to the factory.
Honest pricing
Supported combinations show an instant price in the Project Builder. Anything outside verified evidence stays in specialist review — no guessed substitutes or bait numbers.
What is included, and what is not
Included:
- Impact windows in single hung, horizontal roller and picture window configurations, and impact doors in sliding glass, entry and french door configurations, each manufactured to the size on the order.
- A specification check of every opening: size against documented manufacturer limits, configuration and handing, and flags for likely problems such as a width and height swap.
- Confirmation, during review, of the approval document for the exact product and size you selected.
- Delivery by UPS or freight carrier, with the fee confirmed for your address.
Not included:
- Professional measurement. On installed projects, your measurements are a starting point and professional measurement confirms final sizes before ordering. For material-only orders, you provide the confirmed manufacturing sizes; professional measurement is not included.
- Installation, anchoring, flashing, stucco or trim work.
- Pulling the permit or scheduling inspections.
- Bedroom egress and building-code requirements are not evaluated automatically. They are checked during professional review.
Approval documents, by product
A permit for window or door replacement lists each unit with its product approval: a Miami-Dade Notice of Acceptance or a Florida Product Approval (FL number). What this site holds today is below, and it is shown as a catalog reference, not as a project approval. The document that covers your exact product, configuration and size is confirmed during review.
| Brand | Approval data on this site |
|---|---|
| Mr. Glass | Florida Product Approval numbers transcribed from the 2024 catalog: MG-300 horizontal sliding window (FL #20359.1 LMI, FL #20359.2 SMI); MG-350 (HR) horizontal rolling window (FL #41890.1 LMI); MG-350 (SH) single hung (FL #41887.1 LMI); MG-350 (PW) fixed picture window (FL #41889.1 LMI). |
| ES Windows (ESW) | Catalog design loads quoted as references; no approval number published here. |
| ES Residential (ESR) | No design pressure or approval number published here. |
Check any approval yourself, including its expiration and scope, on the Florida Building Commission Product Approval search. How to read an NOA and the HVHZ guide explain which document a Miami-Dade or Broward permit needs.
Where material ships
Material supplied nationwide via UPS or freight (delivery fee applies). Installation is offered in South Florida only. Inside Miami-Dade, Broward and Palm Beach counties you can choose material-only or an installed project. Everywhere else in Florida the order is material-only. Regional pages cover what is specific to each area:
- Tampa Bay
- Orlando and Central Florida
- Jacksonville and Northeast Florida
- Southwest Florida
- Sarasota and Bradenton
- Treasure Coast and Space Coast
- Florida Panhandle
- Florida Keys
- Daytona Beach and Volusia
- Nature Coast and The Villages
- Ocala, Gainesville and North Central Florida
- Florida Heartland
- Big Bend and Suwannee Valley
The delivery method, how the fee is set and a receiving checklist are in shipping impact windows across Florida. Out-of-state projects start at the out-of-state quote guide.
Permits stay with the buyer or the contractor
SmartWay supplies the product; the permit is requested by whoever does the work, from the building department that governs the property. For a contractor that is routine. For an owner doing the work on their own home, Florida has an owner-builder exemption with its own conditions, including supervising the work on site; the permits and inspections guide explains it and what inspectors look at. In a condominium or association, approval often comes before the permit: see association approval.
Contractor workflow
Repeat projects, duplicated openings, quantity per line: the Project Builder is built for a window schedule, not just a single bedroom. Name each opening the way your plans do, enter the confirmed manufacturing size with its fractions, and set a quantity on a line instead of retyping identical openings. Supported exact configurations show a price immediately; the rest go to a specialist together with the whole schedule, so the answer starts from what you entered. Batch entry mode is on the roadmap.
Before you confirm, check that the size you entered is the manufacturing size your installer expects, not the rough opening. Rough opening vs window size covers the difference.
Manufacturing windows
- ES Windows (ESW) — typically 6 to 9 weeks
- Mr. Glass — typically 8 to 12 weeks
These are manufacturing windows, not delivery dates: they start when an order is confirmed, and measurement, permitting and installation scheduling sit outside them. Your specific window is confirmed during project review. Last confirmed November 11, 2026; a window that has aged is not a cautious estimate, so it carries its date.