Impact windows · Miami Beach, FL
Impact windows in Miami Beach, sized to your building.
Miami Beach sits on a barrier island inside Miami-Dade County, which places every opening in the city under the High-Velocity Hurricane Zone of the Florida Building Code. Replacement work here goes through the city’s permitting process before anything is ordered.
What the building code means in Miami Beach
Miami Beach is in Miami-Dade County, entirely inside the High-Velocity Hurricane Zone. Window and door replacement requires a building permit, and product approvals must be HVHZ-rated — we verify the approval document for your exact configuration during project review.
Miami-Dade County · High-Velocity Hurricane Zone (HVHZ)
Miami Beach at a glance
Permit office
- Jurisdiction
- City-run (Miami Beach issues its own permits)
- Permit office
- Miami Beach Building Department
- Address
- 1700 Convention Center Drive, Miami Beach, FL 33139
- Phone
- (305) 673-7610
- Online permits
- Citizen's Self Service (CSS) portal (EnerGov)
Hurricane zone and wind
- Hurricane zone
- Inside the High-Velocity Hurricane Zone (all of Miami-Dade County)
- Design wind speed, Risk Category II
- 175 mph (Florida Building Code 2023, §1620.2)
Housing in Miami Beach (Census estimate)
- Median year built
- 1969
- Housing units
- 63,225
- Built before 2000
- 54,242 units (85.8%)
- Owner-occupied
- 38.7% of 40,838 occupied units
In Miami Beach, about 9 in 10 housing units date from before 2000 (85.8%), against 77.2% across Miami-Dade County; median year built is 1969 here and 1980 county-wide. Of the 11 Miami-Dade County cities covered on this site, Miami Beach is 5th by share of housing built before 2000. Every unit built before 2000 predates the first statewide code, in force from March 1, 2002.
| Built | Units | Share |
|---|---|---|
| 2020 or later | 261 | under 1% |
| 2010 to 2019 | 1,889 | 3% |
| 2000 to 2009 | 6,833 | 11% |
| 1990 to 1999 | 4,733 | 8% |
| 1980 to 1989 | 6,262 | 10% |
| 1970 to 1979 | 9,466 | 15% |
| 1960 to 1969 | 15,316 | 24% |
| 1950 to 1959 | 7,694 | 12% |
| 1940 to 1949 | 4,989 | 8% |
| 1939 or earlier | 5,782 | 9% |
Areas named on the official Miami Beach government site
- Areas
- South Beach, Mid Beach, North Beach, Flamingo Park, Sunset Harbour and Normandy Shores
Flood insurance community
- NFIP community
- City of Miami Beach — 120651
- Community Rating System class
- 5
Local considerations
The builder accepts fractional opening measurements, and, on installed projects, professional measurement confirms every opening before an order is placed. Confirm any condominium or association requirements for your building with its board before finalizing a frame color or grid layout.
Choose the right project path
For material-only supply, you provide the opening sizes used for manufacturing; professional measurement is not included. For installed projects, the measurements you enter start the review and professional measurement confirms the openings before ordering.
Miami Beach questions
Where do I get a window replacement permit in Miami Beach?
From the city’s own office: Miami Beach Building Department, 1700 Convention Center Drive, Miami Beach, FL 33139, (305) 673-7610. Online: Citizen's Self Service (CSS) portal (EnerGov).
Is Miami Beach in the High-Velocity Hurricane Zone?
Yes. The Florida Building Code defines the zone as Broward and Miami-Dade counties, and Miami Beach is in Miami-Dade County. Risk Category II design wind speed for Miami Beach: 175 mph.
What does the age of Miami Beach housing mean for a window replacement?
85.8% of housing units in Miami Beach were built before 2000, so their original openings predate the March 1, 2002 statewide code. A replacement is permitted under the code in force when the permit is issued.
Sources for Miami Beach
- Florida Building Commission — Florida Building Code (official portal)
- Miami-Dade County — windows, shutters and doors: permit submittal and Notice of Acceptance
- Florida Building Commission — statewide Product Approval search
Sources for the Miami Beach facts above
- City of Miami Beach — building services
- City of Miami Beach — building department
- City of Miami Beach — online permits page
- Florida Building Code 2023 (8th Edition), Building, Section 202
- Florida Building Code 2023 (8th Edition), Building, Section 1620.2
- U.S. Census Bureau, ACS 2023 5-year, tables B25001, B25003, B25034, B25035 — Miami Beach city, Florida
- Florida Building Commission — 2004 report to the Legislature
- U.S. Census Bureau, ACS 2023 5-year, tables B25001, B25003, B25034, B25035 — Miami-Dade County, Florida
- City of Miami Beach — page naming local areas
- FEMA — Community Status Book, Florida
Read on 2026-10-16. Census figures are survey estimates (ACS 5-year), not a count.
How Miami Beach compares with the other South Florida cities: South Florida housing age and hurricane history study
Building code, permitting and association rules change, and local requirements vary by jurisdiction. The authorities above govern; this page is general information, not legal advice. Confirm your own project with your building department and, where one governs your property, your association.