Miami-Dade County
Impact windows in Miami-Dade County: NOAs, permits and housing by city
Miami-Dade runs the product approval system of the High-Velocity Hurricane Zone: its Product Control Section issues the Notices of Acceptance that qualify windows for HVHZ use. The county also permits its own unincorporated areas, so the office that checks your windows depends on whether the address is inside a city.
Last checked: October 16, 2026. General information, not legal or engineering advice; the building department with jurisdiction and the current code govern.
Miami-Dade County at a glance
- High-Velocity Hurricane Zone
- Yes — the whole county (Florida Building Code 2023, §202)
- Design wind speed, Risk Category II
- 175 mph (Florida Building Code 2023, §1620.2)
- Cities on this site
- 11
- Who issues their permits
- 10 run by the city itself; 1 unincorporated, permitted by the county
- Housing county-wide (Census)
- 1,085,414 units; median year built 1980; 77.2% built before 2000; 52.2% owner-occupied
Miami-Dade wind speed and the Notice of Acceptance
Of the three counties SmartWay installs in, Miami-Dade carries the highest Risk Category II design wind speed in §1620.2 of the 2023 Florida Building Code: 175 mph, county-wide. Like Broward, the whole county is inside the High-Velocity Hurricane Zone defined in §202, so the HVHZ impact provisions of §1626 — large-missile testing up to 30 feet above grade, small-missile testing above — apply to every address from Aventura to Homestead.
The county runs the test and approval machinery behind those provisions. Its TAS 201 (large missile impact), TAS 203 (cyclic pressure after impact) and TAS 202 (static pressure, air and water) protocols are the test names you will see listed in an approval, and its Product Control Section issues the Notice of Acceptance (NOA): a document that states its approval and expiration dates, the drawing it approves, and for glazed products the missile impact rating. Miami-Dade issues separate NOAs for impact and non-impact glazed products, so the impact line matters as much as the number.
Before you accept a quote, look the NOA up yourself in the Product Control search and check the revision, the expiration date and the limits in the drawing. The NOA walk-through reads a real one line by line.
Housing age and permit offices, city by city
Each row is a Miami-Dade County city with its own page on this site, sorted by the share of housing units built before 2000. The first row is the county as a whole, for comparison.
- The oldest median year built is 1966, in North Miami; the newest is 2005, in Doral; for Miami-Dade County as a whole it is 1980.
- The share of housing units built before 2000 is highest in Kendall (91.1%) and lowest in Doral (37.3%).
- 5 of the 11 cities covered here have a larger pre-2000 share than the county-wide 77.2%: Kendall, North Miami, Hialeah, Miami Gardens and Miami Beach.
- Owner occupancy is lowest in Miami (30.7% of occupied units) and highest in Miami Gardens (65.8%); county-wide it is 52.2%.
Who issues the permit in Miami-Dade County
City building departments (10): Aventura, Coral Gables, Doral, Hialeah, Homestead, Miami, Miami Beach, Miami Gardens, Miami Lakes, North Miami.
Unincorporated, permitted by the county (1): Kendall — Miami-Dade County Regulatory and Economic Resources (RER) - Permitting and Inspection Center (Herbert S. Saffir Permitting and Inspection Center).
Kendall, on this site, is a Census-designated place rather than a city: it has no city government, and its building permits come from the county’s Department of Regulatory and Economic Resources (RER), like any unincorporated Miami-Dade address. Inside a city, the city’s own building department issues the permit and publishes its own checklist, built on the county baseline described below. In Coral Gables, exterior work — windows and doors included — goes to the city’s Board of Architects before the Building Division checks it for code compliance, so plan for two approvals in sequence.
Miami-Dade’s permit package and E-Permitting
RER lists replacement windows, mullions and glass doors under permit categories 82 and 83, and exterior doors without glass under category 104. Its baseline package has three required pieces, and an incomplete one is not accepted:
- the building permit application;
- a contact sheet;
- an elevation drawing of each exterior wall with replaced openings, showing their sizes and product approval numbers — Miami-Dade or Florida Building Commission.
The current NOA for each window, glass door or mullion goes with it, and mullion cross-sections are drawn where mullions are used. Contractors submit through the county’s E-Permitting portal, and inspections are scheduled and tracked online. In threshold buildings — more than three stories or more than fifty feet tall — window and door installation also needs a threshold inspection by a special inspector, so a mid-rise or high-rise condominium follows a different inspection path from a house.
An elevation drawing with sizes and approval numbers is easier to assemble from an opening schedule than from memory. The project builder produces one opening at a time; the ratings guide explains design pressure, the number the NOA has to meet for each opening.
Miami-Dade County questions
Does a window in Miami-Dade County need a Notice of Acceptance?
What is the design wind speed in Miami-Dade County?
Who issues window permits in Kendall?
What goes into a Miami-Dade window replacement permit package?
Which Miami-Dade cities on this site have the newest housing?
Sources
Miami-Dade County authorities
- Florida Building Code 2023, Building — §202 definitions (HVHZ: Broward and Miami-Dade)
- Florida Building Code 2023, Building — chapter 16: §1620 HVHZ wind loads, §1626 impact tests
- Miami-Dade County — windows, shutters and doors permits: categories 82, 83 and 104, E-Permitting, threshold inspections
- Miami-Dade County — TAS 201 / 202 / 203 product testing inquiries
- Miami-Dade County — Product Control search (NOA database)
- Miami-Dade County — product control brochure
- City of Coral Gables — Board of Architects review of exterior work
Code, county-wide Census and shared facts
- Florida Building Code 2023 (8th Edition), Building, Section 202
- Florida Building Code 2023 (8th Edition), Building, Section 1620.2
- Florida Building Commission — 2004 report to the Legislature
- U.S. Census Bureau, ACS 2023 5-year, tables B25001, B25003, B25034, B25035 — Miami-Dade County, Florida
City records behind each row
- Aventura: Census · jurisdiction
- Coral Gables: Census · jurisdiction
- Doral: Census · jurisdiction
- Hialeah: Census · jurisdiction
- Homestead: Census · jurisdiction · online permits
- Kendall: Census · jurisdiction · permit office · online permits
- Miami: Census · jurisdiction
- Miami Beach: Census · jurisdiction · online permits
- Miami Gardens: Census · jurisdiction
- Miami Lakes: Census · jurisdiction
- North Miami: Census · jurisdiction
Read on October 16, 2026. Census figures are survey estimates (ACS 5-year), not a count. City sites move pages; confirm an office or portal with the city before relying on it.