Brands · ES Windows (ESW) · Series

ES Windows ES-6000 impact sliding glass door

An ES Windows sliding glass door series released on SmartWay in two glass versions, laminated and insulaminated, each its own catalog line. On SmartWay the ES Windows ES-6000 has 13 exact identities across 9 configuration codes, 2 finishes and 3 glassmakeups. A covered identity gets an instant material figure at the exact size you enter.

ES Windows and ES-6000 are manufacturer names used to identify products. Catalog figures below are attributed references, not a project approval.

Check my opening with the ES Windows ES-6000 →

Get your price

Opens the builder with your size. Fractions like 35 1/2 work.

ES Windows ES-6000 specifications

Each row names its source. “Not transcribed” means SmartWay has not transcribed that value, not that the series lacks one.

SpecificationValueSource
Product type on SmartWaySliding Glass DoorSmartWay pricing release
Configuration codesXXX-L (2), OX, OX-XO, OXO-L, OXO-R, XO, XX, XXX-R (2), XXO (3)SmartWay pricing release
Exact identities13SmartWay pricing release
Finishes in the releaseWhite; AAMA 2604 WhiteSmartWay pricing release
Glass in the releaseClear / Insulated Laminated; Bronze + Insulated Laminated; Clear / LaminatedSmartWay pricing release
Glass familiesinsulated laminated, laminatedSmartWay pricing release
Typical manufacturing window6 to 9 weeksManufacturing window, confirmed November 11, 2026
Product approval numberNot transcribed: confirmed for your configuration and size at reviewSmartWay pricing release
Design pressureNot transcribed: confirmed for your configuration and size at reviewSmartWay pricing release

Compare across series: frame colors and finishes · glass tint, privacy and Low-E

ES Windows ES-6000 lines in the release

The ES Windows ES-6000 is released as 3 catalog lines. Each line is its own identity set with its own figures.

LineProduct typeConfigurationsExact identities
ES-6000 INSULAMINATEDSliding Glass DoorXXX-L (2)1
ES-6000 INSULAMINATED - SLIDING GLASS DOORSliding Glass DoorOX, OX-XO, OXO-L, OXO-R, XO, XX, XXX-R (2)8
ES-6000 LAMINATEDSliding Glass DoorOX, XO, XX, XXO (3)4

What SmartWay prices instantly

  • 13 exact identities across the 9 configuration codes above, in the released finishes and glass.
  • The material figure for the exact width and height you enter, fractions included, when that identity and size are covered by the released data.
  • Each result priced from ES Windows data only; it is never filled in from another brand.

What goes to specialist review

  • Any configuration code not listed above, and any finish or glass makeup outside the released lists.
  • Sizes the documented data does not cover for that exact configuration.
  • Design pressure, product approval and egress for your opening: a verified price is not a product approval.

How to read the ES Windows ES-6000 configuration codes

Readings come from the SmartWay glossary; a code it does not cover is left undecoded, not guessed. See window configurations explained and XO vs OX, OXXO sliding glass door codes, or how a sliding glass door works.

CodeHow to read itGlossary
XXX-L (2)3 panels, read left to right as viewed from outside: operating, operating, operating. Every panel operates. The -L suffix is part of the manufacturer identity text. The number in parentheses is part of the manufacturer identity text.X, O
OXA two-panel slider with the fixed panel on the left and the operating panel on the right, viewed from outside.OX
OX-XOA two-panel slider with the fixed panel on the left and the operating panel on the right, viewed from outside.OX
OXO-LThree panels with the center one operating and both sides fixed. Some drawings use it for a center-opening door or window. The -L suffix is part of the manufacturer identity text.OXO
OXO-RThree panels with the center one operating and both sides fixed. Some drawings use it for a center-opening door or window. The -R suffix is part of the manufacturer identity text.OXO
XOA two-panel slider with the operating panel on the left and the fixed panel on the right, viewed from outside. From inside, the same unit reads OX.XO
XXTwo panels that both operate, as on a double slider.XX
XXX-R (2)3 panels, read left to right as viewed from outside: operating, operating, operating. Every panel operates. The -R suffix is part of the manufacturer identity text. The number in parentheses is part of the manufacturer identity text.X, O
XXO (3)3 panels, read left to right as viewed from outside: operating, operating, fixed. 2 of 3 panels operate; O marks a fixed panel. The number in parentheses is part of the manufacturer identity text.X, O

ES Windows ES-6000 in the manufacturer catalogs

SmartWay has not mapped the ES Windows ES-6000 to a page of a published catalog. The original ES Windows catalogs are on the manufacturer catalogs page.

ES Windows ES-6000 questions

Which ES Windows ES-6000 configurations can I price instantly?
9 configuration codes are released for the ES Windows ES-6000: XXX-L (2), OX, OX-XO, OXO-L, OXO-R, XO, XX, XXX-R (2) and XXO (3). Together with the released finishes and glass they make 13 exact identities, each priced at the width and height you enter. Anything outside that list goes to specialist review.
Does SmartWay publish a design pressure or approval number for the ES Windows ES-6000?
Not yet. SmartWay has not transcribed a design pressure or product approval number for the ES Windows ES-6000 from a catalog page, so it does not print one. Both are confirmed for your exact configuration and size during specialist review, and you can look up an approval yourself in the Florida Building Commission Product Approval search.
What glass and finishes does the ES Windows ES-6000 come in on SmartWay?
The release lists 3 glass makeups (insulated laminated and laminated) and 2 finishes for the ES Windows ES-6000. The full lists are in the specification table on this page; any other glass or finish goes to specialist review.
How long does the ES Windows ES-6000 take to build?
ES Windows typically takes 6 to 9 weeks in production, last confirmed November 11, 2026. That is a manufacturing window, not a delivery date: measurement, permitting and installation scheduling sit outside it, and your window is confirmed at project review.