Hurricane code · Coral Springs · Broward County
Hurricane window code in Coral Springs: what applies to your home
Every Coral Springs home is in the High Velocity Hurricane Zone, because the Florida Building Code places all of Broward County in it, even inland cities near the Everglades. A typical home is designed for 170 mph winds, and the city checks window retrofits under Broward's Formal Interpretation #24 using its own Form 015.1 packet.
Last checked: October 24, 2026 · General information, not engineering or legal advice. Confirm requirements for your address with the building department.
Inland near the Everglades, but still in the HVHZ
Coral Springs sits about 20 miles northwest of Fort Lauderdale, with the Everglades to the west and the Sawgrass Expressway along its northern and western edges. Many owners assume that distance from the ocean means lighter window rules. It does not.
The 2023 Florida Building Code (8th Edition), in effect since December 31, 2023, defines the High Velocity Hurricane Zone (HVHZ) as Broward and Dade counties. There is no inland carve-out. A home in ZIP 33076 by the Sawgrass gets the same HVHZ provisions as a beachfront Broward home.
Wilma's eye passed over Coral Springs
On October 24, 2005, Hurricane Wilma's eye passed directly over the city. It was the most powerful storm to strike Coral Springs since the city was incorporated. Associated Press coverage reported many roofs severely damaged in Coral Springs, and a man in the city was killed when a tree fell on him. The city later estimated its tree canopy fell by about one third after the 2004 and 2005 storms.
In 2017, Hurricane Irma brought tornado warnings and power outages of up to a week in parts of the city. For an inland home, wind and wind-borne debris, not storm surge, are the main threat to windows and doors.
A 1980s city: which code era built your home?
Coral Springs was chartered on July 10, 1963 as a master-planned city, and most of it was built in a short window. Census estimates for 2024 count 47,327 housing units with a median year built of 1988. The 1980s alone account for nearly a third of all homes.
That matters because South Florida's hurricane rules changed in steps. After Hurricane Andrew in 1992, an enhanced South Florida Building Code with hurricane mitigation provisions was adopted for Broward and Dade counties in 1994. The first statewide Florida Building Code followed in 2002. About 79% of Coral Springs housing units were built before 2000, so most original windows here predate today's rules.
- 1990s or 2000s home: the original permit date decides the code era.
- Any age: a replacement window must meet the code in force when you apply for the permit.
| Decade built | Approx. units | Share | Code era |
|---|---|---|---|
| 1970s | 9,458 | 20.0% | Before the 1994 enhanced South Florida code |
| 1980s | 15,060 | 31.8% | Before the 1994 enhanced South Florida code |
| 1990s | 10,063 | 21.3% | Straddles the 1994 enhanced code |
| 2000–2009 | 9,118 | 19.3% | Straddles the 2002 statewide Florida Building Code |
| 2010 or later | 1,028 | 2.2% | Florida Building Code era |
170 mph, and what it means for each opening
Inside the HVHZ, FBC 2023 Section 1620.2 sets one countywide design wind speed (a 3-second gust) for all of Broward. Most homes are Risk Category II, so a typical Coral Springs house is designed for 170 mph.
Each window also needs a design pressure, in pounds per square foot (psf), based on roof height, opening size and wall position. Openings near a corner or wall end (Zone 5) see more suction than mid-wall openings (Zone 4). The Broward voluntary wind load chart (ASCE 7-22, valid only up to a 30-foot mean roof height) lists, for a 10 sq ft opening at a 15-foot roof height, +38.1 psf, -41.4 psf in Zone 4 and -51.0 psf in Zone 5. At 30 feet: +43.9, -47.6 and -58.8 psf.
Section 1626.2 applies the large-missile test (TAS 201 and TAS 203) to assemblies up to 30 feet high: a 9-pound 2x4 striking at 50 feet per second, then cyclic pressure loading of the glazing.
| Risk category | Design wind speed (3-second gust) |
|---|---|
| I | 156 mph |
| II (typical home) | 170 mph |
| III | 180 mph |
| IV (essential facilities) | 185 mph |
Product approval: what the Coral Springs packet asks for
Every window and door needs a product approval that covers its size and design pressure. Florida Statute 553.842 lists the Miami-Dade Product Control Division among the evaluation entities the Florida Building Commission approves, and says a statewide approval bars extra local testing when the product is used within its conditions.
Coral Springs' Form 015.1 asks for "NOA (Notice of Acceptance)/Product Approvals" with sizes and pressures highlighted and the opening ID at each column. Confirm with the department which approval type it accepts for your product before you buy.
Broward's FI #24: the rulebook for a Coral Springs retrofit
Broward County's Board of Rules and Appeals (BORA) Formal Interpretation #24 was approved October 12, 2023 and reissued January 9, 2025. It covers retrofit of windows, doors, garage doors and shutters on detached one- and two-family homes and townhouses with a common roof height under 30 feet. That describes most single-family homes in Coral Springs, and the city's Form 015.1 (revised February 20, 2025) tells applicants to review it before they submit.
- Design pressure for each opening can be shown three ways: a signed and sealed site-specific plan by a Florida P.E. or architect; an unsealed site plan plus a signed and sealed worst-case pressure chart; or an unsealed site plan using the Broward voluntary wind load chart.
- Buildings over 30 feet need a sealed site-specific design. Generic charts are not accepted above 30 feet.
- A Florida P.E. or architect may change the buck or fasteners shown in a product's Notice of Acceptance, but only with a signed and sealed letter or drawing.
How a window permit moves through the Coral Springs Building Department
The city's hurricane recovery permitting guide lists non-like-for-like window and door replacement as work that needs a permit. Replacing glass in existing approved frames, with no frame damage, does not.
- Sketch and label every opening. An ink floor-plan sketch labels each opening with a letter or number. Stacked glass in one opening is labeled bottom to top (A, A1, A2).
- Complete the Broward retrofit schedule. Per opening: approval number and rating, required design pressure, width x height and area, wall zone (4 or 5), impact glazing, existing shutters, and whether new mullion tubes are needed.
- Assemble the packet. Add the highlighted approvals, a Broward County Uniform Building Permit Application, a sealed detail if any opening is altered, and the Owner/Builder Affidavit Packet (Form 029.0) if the owner applies. Paper submittals need two sets.
- Submit through eTRAKiT. Use etrakit.coralsprings.gov. Digitally signed and sealed documents must be uploaded there, not walked in. In person, use the One-Stop Shop at City Hall, 9500 West Sample Road, or the 24/7 parking garage drop box.
- Record the Notice of Commencement when required. Under Florida Statute 713.135, contracts above the statutory threshold need a recorded Notice of Commencement filed and posted on site before the first inspection.
- Schedule inspections online. Since February 1, 2025, inspections are not booked by phone and have no set times. Schedule in eTRAKiT; structural inspections get two-hour windows. Cancel by calling 954-344-1025 before 8 a.m. or a re-inspection fee may apply.
Planned-city appearance rules and HOAs
Coral Springs' strict appearance rules date from its planned-city start: ordinances restrict exterior paint colors, roofing materials, signs and landscaping. We found no city rule requiring design review of window style or frame color on a single-family home, and no historic districts. Ask the city if you are changing an opening's size or look.
Many neighborhoods, such as Turtle Run and the gated Fairways at Eagle Trace, have associations that may set rules on frame color, tint or muntins. Get written approval before the permit packet is final.
Condos, townhouses and taller buildings
About 27.4% of Coral Springs housing units are in buildings with five or more units, and 9.0% are townhouses. Those owners face different rules.
- Townhouses under a 30-foot roof height fall under FI #24, like detached homes.
- Buildings over 30 feet need a sealed site-specific design for every retrofit opening.
- Florida Statute 553.899 requires milestone inspections of condo and co-op buildings three or more habitable stories tall. Broward's Building Safety Inspection Program (BORA Policy #05-05) inspects at 25 years from the certificate of occupancy, then every 10 years; fee simple townhouses are exempt. Required repairs are generally due within 180 days, with permits.
Flood zone: ask the city, not a map guess
Coral Springs is inland, so window decisions here are mostly about wind. Flood zone still affects some projects. The city takes part in FEMA's Community Rating System, and its Engineering Department (954-345-2160) gives property-specific flood map details, including FIRM panel, flood zone and base flood elevation, through a Flood Information Request Form.
What to have ready before you ask for a written quote
You can send your measurements to SmartWay at (754) 303-7130 for a written quote. The Coral Springs Building Department Customer Care Call Center is 954-344-1025, or email buildingpermits@coralsprings.gov.
- Year built and, for 1990s and 2000s homes, the original permit date.
- Mean roof height, which decides whether the Broward chart can be used.
- Width x height of each opening, noting which sit near a wall corner (Zone 5).
- Doors and sliders counted separately, plus any openings you want to resize.
- Your association's written window rules, if you have an HOA or condo board.
- After installation, a wind mitigation inspection on form OIR-B1-1802 can document the new opening protection for your insurer.
Coral Springs questions
Is Coral Springs in the High Velocity Hurricane Zone even though it is inland?
What design wind speed applies to a house in Coral Springs?
Do I need a permit to replace windows in Coral Springs?
What is BORA Formal Interpretation #24 and why does Coral Springs use it?
My Coral Springs home was built in the 1980s. Are the original windows up to code?
How are window inspections scheduled in Coral Springs?
Sources
- 2023 FBC 8th Ed. Ch. 2, Sections 1620.2 and 1626.2 (National Glass Association handout, Sept 2023)
- City of Coral Springs Form 015.1, Retrofit of Windows & Doors Submittal Packet (rev. 2/20/2025)
- Broward BORA Formal Interpretation #24 (8th Edition) and Voluntary Wind Load Chart
- City of Coral Springs Building Department
- City of Coral Springs eTRAKiT portal
- City of Coral Springs Hurricane and Tropical Storm Recovery Permitting Guide
- City of Coral Springs Owner/Builder Affidavit Packet (Form 029.0)
- City of Coral Springs Flood Zone Information
- Florida Statutes s. 553.842 (product approval)
- Florida Statutes s. 713.135 (Notice of Commencement)
- Florida Statutes s. 553.899 (milestone inspections)
- Broward BORA Policy #05-05, Building Safety Inspection Program (Aug 9, 2024)
- U.S. Census Bureau ACS 2024 1-year, tables B25001, B25024, B25034, B25035
- Wikipedia: Coral Springs, Florida
- AP via Al Jazeera, 'Hurricane Wilma batters Florida' (Oct 25, 2005)
- AP via Deseret News, 'Wilma's wrath' (Oct 25, 2005)
- Eagle Eye, 'Broward recovers from impact of Hurricane Irma'
- BEX Realty, Turtle Run community page