Hurricane code · Oakland Park · Broward County
Which hurricane code applies to windows in Oakland Park, Florida?
Oakland Park is in Broward County, part of Florida's High-Velocity Hurricane Zone, so replacement windows and doors need a permit and a Miami-Dade NOA or an HVHZ-approved Florida Product Approval. Permits go through the city's Building and Permitting Division at 1100 Park Lane East, not the older Dixie Highway address on some forms.
Last checked: November 3, 2026 · General information, not engineering or legal advice. Confirm requirements for your address with the building department.
Which Oakland Park window permit path fits your project?
Classify the openings before you build your permit checklist. Open the example that matches your project to see which details to prepare.

I’m replacing a window in the same opening
I’m widening an opening for a patio door
My building is taller than 30 feet
List each opening ID, what’s there now, what you want to install, and whether the opening changes. Use the measurement guide to take preliminary notes. Check your project with Oakland Park Building & Permitting. Get the window and door schedule from the city.
A city that has already been through one hurricane rebuild
Oakland Park started life as Floranada, founded in early 1925 by a group of international investors. The name blended Florida and Canada. The 1926 hurricane pushed the town into bankruptcy. Local farmers and ranchers re-formed it, and the city says it was incorporated on July 1, 1929. Its centennial is coming in 2029.
About 44,229 people live here now, on roughly 8.2 square miles.
City Hall now sits in the Sky Building at 38th Street and Dixie Highway, the north-south spine of downtown. The permit counter moved with it, and that move is the first trap for homeowners. Some older city forms and local articles still print the former counter address. We cover the current one below.
HVHZ status and the wind speed behind it
Broward and Miami-Dade counties together form the Florida Building Code's High-Velocity Hurricane Zone, known as the HVHZ. It carries the strictest wind provisions in the state code, and every address in Oakland Park falls inside it. The edition in force is the Florida Building Code, 8th Edition (2023), effective December 31, 2023. The Florida Building Commission lists no later edition as in effect.
For wind loads, Section 1620.2 of the HVHZ chapter sets Broward design gusts at 156 mph for Risk Category I and 170 mph for Risk Category II, which covers typical homes. Categories III and IV are 180 and 185 mph. Miami-Dade's Category II figure is 175 mph, for comparison.
Your own openings get their pressure from roof height and where each window sits on the wall.
What the window itself must carry
In the HVHZ, a window or door needs either a Miami-Dade Notice of Acceptance (NOA) or a Florida Product Approval number (FL#). The Florida record must say the product is approved for use in the HVHZ. Not every Florida approval is.
HVHZ products are tested to TAS 201 for large missile impact, TAS 202 for static pressure and TAS 203 for cyclic loading. Check the approval record on floridabuilding.org before you order.
- Find the approval number. Ask for the NOA or FL# of the exact series and size, not just the brand name.
- Open the floridabuilding.org record. Search the number and read the Limits of Use and the HVHZ line.
- Match pressure to opening. The approved pressure rating must meet or beat the design pressure for that opening.
The Oakland Park permit office, in detail
Window and door permits are handled by the City of Oakland Park Building and Permitting Division. The city lists it in the Sky South Building, 1100 Park Lane East, 1st Floor, Oakland Park, FL 33334. The phone is 954-630-4350 and the email is building@oaklandparkfl.gov. City hours are Monday through Friday, 7:30 am to 4:30 pm, except city holidays.
Older notices and forms give 5399 N. Dixie Highway, Suite 3. That is the superseded address. If you hold a printout or a blog post with it, check with the division before driving over.
The city's Window and Door Permit Requirements sheet applies to residential and commercial jobs. For a simple replacement with no change in opening size, it asks for the items below. The sheet is several years old, so confirm the current list with the division.
- A floor plan showing the location, type and size of each window or door.
- Two copies of the Product Approval for each type of window or door.
- The Broward County uniform window and door schedule.
- The Broward County uniform building permit application.
- Extra items if you add an opening or change an opening's size.
Online filing, and where owner-builders must show up
A city flyer lists Window and Door Replacement among the residential permits that can be filed online. New construction, remodels and commercial permits are not accepted that way. A permit directory says the city takes applications through the Accela system and points to the city's Permit Access page. The city itself confirms only the email and phone above, so start there.
The city publishes an Owner Builder Disclosure form for homeowners who pull their own permit under the Florida owner-builder exemption. A local publication reports that an owner-builder must apply in person and certify that they read the Owner/Builder Affidavit and Disclosure Statement. We could not read the form, so ask the division what it needs.
Broward requires its Uniform Retrofit Window and Door Schedule with every retrofit application (Board of Rules and Appeals Policy 20-01, revised April 11, 2024). It lists each opening's approval number, pressure rating, required design pressure, size, wall zone, glazing, shutters and mullions.
Neighborhoods, ZIP codes and what to watch in each
The city's 2026 association list includes the areas below. We only describe what sources confirm.
ZIP codes are tricky here. Statistical Atlas lists 33306, 33308, 33309, 33311 and 33334 for the city. ZIP 33306 is shared with Fort Lauderdale and Wilton Manors, and many Oakland Park addresses carry a Fort Lauderdale mailing name. A mailing address does not tell you which city issues your permit. Your property record does.
| Area | What is confirmed | What it means for windows |
|---|---|---|
| Lake Emerald | Has its own owners association on the city's 2026 list | Check association rules before you order |
| Lloyd Estates | About 1,613 residents; borders Andrews Gardens, Harlem McBride, Prospect Gardens and Sleepy River | Neighborhood association exists; confirm any review step |
| Coral Heights and Villas at Coral Heights | Both on the city list; the Villas has a condominium association | Condo units need association approval first |
| Andrews Gardens and North Andrews Gardens | Recognized neighborhoods | Look up your own build year; the city median is 1972 |
| Harlem McBride and Garden Acres | Recognized neighborhoods | Same: build year decides which code era applies |
| Central Business District | Downtown along Dixie Highway, around the Sky Building | Mixed use; commercial rules differ from residential |
Your house's age tells you which code built it
The median home in Oakland Park was built in 1972, based on Census ACS data reported by City-Stats. Of about 19,193 housing units, around 56.4% are owner-occupied. Street-level data shows median build years from the late 1960s to the 1990s depending on the area.
So most local homes were built before the 1994 South Florida Building Code amendments and before the 2002 Florida Building Code. That has practical meaning. Homes of that era usually have older windows that were never tested for large missile impact. They may have older shutters, or none.
- Built before 1994: expect original windows built for far less than today's requirements. Replacement must meet current HVHZ rules.
- Built 1994 to 2002: South Florida code era. Check what protection was installed and its approval.
- Built after 2002: Florida Building Code era. Opening protection is likely present; verify it still carries a valid approval record.
The 30-foot line: charts for houses, engineers for towers
Broward's Formal Interpretation #24 governs retrofit of windows, doors, garage doors and shutters on detached one- and two-family homes and townhouses with a roof height under 30 feet. It was approved October 12, 2023. Each opening's design pressure comes from one of three routes: a signed and sealed site-specific plan, an unsealed plan plus a sealed worst-case pressure chart, or an unsealed plan using the Broward Fenestration Voluntary Wind Load Chart, based on ASCE 7-22.
Buildings 30 feet or taller need a signed and sealed site-specific design from a Florida engineer or architect. Generic charts do not apply. That is what a condo board or a mid-rise association faces.
Flooding is a bigger Oakland Park story than surge
A city grant application states that Oakland Park lies within an AH or AE zone Special Flood Hazard Area and names the North Fork of the Middle River as a source of inland flooding. FEMA also describes a drainage project that followed flooding in 1999, funded through its Hazard Mitigation Grant Program.
The city has its own Floodplain Management Ordinance covering every flood hazard area within its limits. Window replacement alone usually does not trigger floodplain review, but ask the division if your work is part of a larger project.
Condos, associations and building safety inspections
The city's 2025 Building Safety Inspection Submittal Form covers both 10-year and 25-year inspections. Questions go to the program line at 954-630-4334. This follows Broward Policy #05-05, effective August 9, 2024. It replaced the old 40-year program: buildings are inspected at 25 years from the certificate of occupancy and every 10 years after. Repairs are generally due within 180 days of the report.
Florida Statute 553.899 sets the state milestone rule for buildings of three or more habitable stories, and the Broward program counts as compliance. One- to four-family dwellings of three stories or fewer are exempt, along with fee simple townhouses and buildings under 3,500 square feet.
Failing windows on a repair list are a permit item like any other.
Paperwork that catches Oakland Park homeowners
If the contract is above the threshold in Florida Statute 713.135, a recorded Notice of Commencement must be filed with the permitting office before the first inspection. For an insurer, a wind mitigation inspection on form OIR-B1-1802 can document opening protection.
The 1100 Park Lane East office is Oakland Park's, not neighboring Fort Lauderdale's. If you want help turning your measurements into a written quote, SmartWay can be reached at (754) 303-7130.
Oakland Park questions
Do I need a permit to replace windows in Oakland Park?
Is Oakland Park in the HVHZ?
What wind speed are windows designed for in Oakland Park?
Can I use shutters instead of impact windows in Oakland Park?
Does my Oakland Park condo need association approval?
What is the Oakland Park 25-year inspection and how does it affect windows?
Sources
- City of Oakland Park - Building and Permitting
- City of Oakland Park - Window and Door Permit Requirements
- City of Oakland Park - Residential permitting online flyer
- City of Oakland Park - Owner Builder Disclosure
- City of Oakland Park - 2025 Building Safety Inspection Submittal Form
- City of Oakland Park - Resilient Florida grant application
- City of Oakland Park - Neighborhood Associations 2026
- Broward BORA Formal Interpretation #24 (8th Edition)
- Florida Statute 553.899 - milestone inspections
- FEMA - Oakland Park drainage project
- Broward BORA Policy 05-05 amendments, effective Aug 9, 2024
- Broward BORA Building Safety Inspection Program brochure (2024)