Hurricane code · Margate · Broward County

Which hurricane code applies to windows in Margate, Florida?

Margate is inside Broward County's High-Velocity Hurricane Zone, so replacement windows and doors need a Miami-Dade NOA or an HVHZ-approved Florida Product Approval. Permits go through the City of Margate Building Department at 901 NW 66th Avenue, using its ProjectDox portal and the Broward retrofit window schedule.

Last checked: November 3, 2026 · General information, not engineering or legal advice. Confirm requirements for your address with the building department.

Margate is an inland canal city built mostly before 1994

Margate has no ocean or Intracoastal frontage. Its water is a network of canals, which the city puts at 30 miles inside roughly 9 square miles in northwest Broward County. For a window buyer, that means wind is the main code issue, not coastal surge. Coastal Exposure D conditions, which the older Broward chart excluded, do not describe an inland city like this one.

The town was incorporated on May 30, 1955 and became a city in 1961. Its name joins the first three letters of founder Jack Marqusee's last name with the first four letters of "gateway."

Third-party summaries of Census survey data give a median year built of 1978, across about 27,000 housing units. That is only a summary, but it points to a typical Margate home built before the 1994 South Florida Building Code changes and long before the 2002 statewide code. Original openings were not designed to today's rules.

Margate sits inside the High-Velocity Hurricane Zone

Broward and Miami-Dade counties together form the High-Velocity Hurricane Zone, or HVHZ, in the Florida Building Code. It carries the strictest wind provisions in the state code, and every Margate address is covered. The edition in force is the Florida Building Code, 8th Edition (2023), effective December 31, 2023.

The 2023 Florida Building Code, Section 1620.2, sets one design wind speed for all of Broward County: 170 mph (3-second gust) for Risk Category II buildings such as typical homes. Your opening's pressure then comes from the county chart or a sealed plan, below.

Product approval: NOA or a Florida Product Approval with HVHZ use

In the HVHZ, a window or door needs a Miami-Dade Notice of Acceptance (NOA), or a Florida Product Approval (FL number) whose Limits of Use say it can be used in the HVHZ. Not every Florida approval qualifies. The floridabuilding.org record is the place to check.

HVHZ testing covers large missile impact (TAS 201), static pressure (TAS 202) and cyclic loading (TAS 203). Before you pay a deposit, ask for the approval number for each product and confirm its pressure rating meets what your opening needs.

How design pressure is set for a Margate home

Broward's Board of Rules and Appeals Formal Interpretation #24 governs retrofit of windows, doors, garage doors and shutters on detached one- and two-family homes and townhouses with a mean roof height under 30 feet. Each opening's design pressure must come from one of three routes:

The current chart is based on ASCE 7-22. It lists wall pressures by mean roof height (15, 20, 25 and 30 feet), wall zone and tributary area. Zone 4 is the field of the wall and zone 5 is near the corners.

Above 30 feet, the county chart alone is not accepted. A Florida engineer or architect must seal site-specific loads.

  • a signed and sealed site-specific plan,
  • an unsealed plan plus a sealed worst-case pressure chart, or
  • an unsealed plan using the Broward County Fenestration Voluntary Wind Load Chart.

Where you live in Margate: ZIP codes and what to expect

We only list areas we could confirm. Single-family neighborhood names beyond these are not in our sources, so we leave them out.

Confirmed Margate areas and what they mean for windows
AreaZIPWhat we can say
Central Margate, including City Hall and the Building Department33063Permit office is here at 901 NW 66th Avenue. Typical housing is the pre-1994 era.
Oriole Gardens, along NW 5th Place and Atlantic Boulevard33063Gated 55+ condominium community in numbered phases with sub-associations. Association rules come before permit work.
Margate Estates, near SW 6th Court33068Southern Margate. The ZIP uses a Pompano Beach mailing name, but the home is in the City of Margate.
Southgate, near SW 2nd Street33068Same ZIP and mailing-name note as Margate Estates.

The Margate Building Department and its window permit packet

The City of Margate Building Department is at 901 NW 66th Avenue, Margate, FL 33063. The main phone is 954-970-3004. The permit window is open Monday through Friday, 7:30 am to 5:30 pm, and the Building Official's office is by appointment only. A city contacts page also lists an inspection line, 954-970-3112. Confirm that number with the department first.

Applications run through ProjectDox, the city's electronic permit and plan review system, on the Avolve Cloud portal. Margate and Broward County also launched ePermitsOneStop for Margate permits and the related county permits in one place. The "Pay and Track Building Permit" option on the city home page shows a permit's status when you type the address.

What the city's packet asks for:

  1. Wind load design pressure chart. The packet calls for the pressure chart that sets what rating each opening must meet.
  2. Broward Uniform Retrofit Window and Door Schedule. Broward Policy 20-01 requires this form with every retrofit permit. Each opening gets a line with its product approval number, pressure rating, required design pressure, size, wall zone, glazing, shutters and mullions.
  3. Placement plan. A drawing showing the size and location of each opening being replaced, or where shutters will go.
  4. Size-for-size answer and tube schedule. You say whether the change is a size-for-size exchange, whether you use the county fenestration chart, and you complete the window, door and mullion tube schedule.

Notice of Commencement and the owner-builder path

The city FAQ says a Notice of Commencement is required for permits above a set construction value. That threshold is lower than the state default that a different Margate checklist cites, so ask the department which one applies to your job before you sign a contract.

If you pull the permit yourself, Margate requires its Owner Builder Affidavit and Disclosure Statement, signed by the owner and returned before the permit issues. It cites Florida Statute 489.103 and makes the owner the responsible party of record. The window packet also includes a residency affidavit for the job address that must be notarized.

Owner-builder packets ask for proof of ownership, such as a deed or homestead exemption, plus a Florida ID.

Your home's age against the code eras

Your house's age matters more than the neighborhood name.

  • Florida Statute 553.844 directs windstorm mitigation for homes built before the Florida Building Code.
  • A wind mitigation inspection on form OIR-B1-1802 can document opening protection for your insurer.
Code era and what it usually means for existing openings
BuiltCode at the timeWhat to expect
Before 1994Before the 1994 South Florida Building Code amendmentsOriginal windows were not designed for HVHZ missile impact. This is where Margate's median sits.
1994 to 2001South Florida Building CodeAsk whether the openings have product approval records.
2002 and laterFlorida Building CodeLikely closer to current rules, but the 8th Edition (2023) still sets what a new permit must meet.

Shutters or impact windows in Margate?

Under the Broward retrofit schedule, every opening needs impact glazing or shutters, and the schedule records which one. Both routes need product approvals and a permit. Shutters are closed and opened each storm; impact glass stays in place.

Condos, 55+ communities and the 25-year safety program

Oriole Gardens is a gated 55+ community split into numbered phases, and listings describe association approval rules for buyers. Ask your association what it requires before you submit a permit. We could not confirm whether the city wants an approval letter with the application.

Margate's 25 Year or Older Building Safety Program page says the program began in 2005 and applies across Broward County. It calls for structural and electrical inspections of buildings 25 years old or older and every ten years after. The city charges a per-building fee at submittal and notifies owners by letter. Broward Policy 05-05 (amended August 9, 2024) replaced the old 40-year program. One- to four-family dwellings of three or fewer stories and fee-simple townhouses are exempt.

Florida Statute 553.899 separately requires milestone inspections for condominium and cooperative buildings three or more stories tall, at 30 years from the certificate of occupancy, then every 10 years. A local agency may set 25 years.

Flood maps and the storms that shaped Broward's rules

Margate's Environmental and Engineering Services department runs the city's part in FEMA's Community Rating System. FEMA's new Broward flood maps took effect July 31, 2024, and the city's February 2025 flood newsletter says only one Margate property moved from an X zone to an AE zone. The city keeps a flood zone map in its document library.

We found no Margate-only wind readings. For county context, the National Weather Service said Hurricane Wilma (October 24, 2005) did its heaviest structural damage in Broward and Palm Beach counties.

Before you ask for a written quote

North Lauderdale sits close enough that one of its schools serves part of Margate, but each city has its own packet and portal.

You can send measurements to SmartWay at (754) 303-7130 and ask for a written quote.

  • Opening sizes and counts, roof height (under or over 30 feet), year built, and any condo or HOA rules.

Margate questions

Do I need a permit to replace windows in Margate?
Yes. Margate has a Windows, Doors, Garage Doors, Shutters permit packet with a wind load chart, the Broward retrofit schedule and a placement plan. Apply through the ProjectDox portal or at 901 NW 66th Avenue.
Is Margate in the HVHZ?
Yes. Margate is in Broward County, which with Miami-Dade forms the Florida Building Code's High-Velocity Hurricane Zone. Products need an NOA or an HVHZ-approved Florida Product Approval.
What wind speed are windows designed for in Margate?
Section 1620.2 of the 2023 Florida Building Code sets 170 mph for Risk Category II buildings across Broward County, Margate included. Pressure per opening comes from a sealed plan or the Broward ASCE 7-22 chart, by roof height, wall zone and area. Over 30 feet needs sealed loads.
Can I use shutters instead of impact windows in Margate?
Yes, if the shutters have an approval and the Broward retrofit schedule lists them for that opening.
Does my Margate condo need association approval first?
Ask your association. Communities like Oriole Gardens have their own rules, and we could not confirm if the city wants an approval letter. Check both before ordering.
How does the 25-year building safety program affect my Margate condo windows?
Buildings 25 years old or more get structural and electrical inspections, then every 10 years. Buildings of three or more stories also fall under the state milestone law. Window repairs an inspector requires may need permits.