Hurricane code · Pembroke Pines · Broward County

Which hurricane code applies to windows and doors in Pembroke Pines?

Pembroke Pines is inside Florida's High-Velocity Hurricane Zone, because the zone covers all of Broward and Miami-Dade counties. Windows and doors need a building permit from the city's Building Division, a product approval that is valid for the HVHZ, and a design pressure that fits a typical Risk Category II wind speed of 170 mph.

Last checked: November 3, 2026 · General information, not engineering or legal advice. Confirm requirements for your address with the building department.

Inland city, same hurricane zone as the beach

Pembroke Pines sits well away from the ocean, and many homeowners assume that means looser window rules. It does not. The Florida Building Code defines the High-Velocity Hurricane Zone, or HVHZ, by county: Broward and Dade. The strict provisions apply to every address in the city.

Some online pages describe the city as outside the HVHZ. The code definition says otherwise.

The city is large: the second-most populous in Broward County, with 171,178 residents at the 2020 census. It grew on former dairy farmland, including tracts of the Waldrep Dairy Farm, so the age of your house matters.

The wind speed and the impact test behind your glass

Section 1620.2 of the 2023 Florida Building Code sets the HVHZ design wind speed for Broward County as a three-second gust that depends on risk category: 156 mph for Category I, 170 mph for Category II, 180 mph for Category III and 185 mph for Category IV. A normal single-family home is Category II, so 170 mph is the number for a typical Pembroke Pines house. Miami-Dade uses 175 mph for the same category.

Section 1626 then says glazing in the envelope must pass impact tests or be covered by an external protection device that does. Up to 30 feet above grade, the large-missile test (TAS 201 and 203) fires a 9-pound 2x4 at 50 feet per second, then cycles pressure on the same assembly. A frame, glass and anchors are approved together as one unit.

  • Impact glazing and external protection are both named by the code, so shutters are a recognized path.

Product approval: the paperwork that has to match your windows

In the HVHZ a window or door needs a Miami-Dade Notice of Acceptance (NOA) or a Florida Product Approval number (FL#). An FL# only works here if its Limits of Use say it is approved for the HVHZ. Not every one is, and the floridabuilding.org record shows the limits.

Whichever series you consider, including ESW, Mr. Glass or PGT, ask for the approval number and read its limits against your opening sizes.

Houses, townhomes and the 30-foot line

Broward's Board of Rules and Appeals Formal Interpretation #24 (8th Edition, approved October 12, 2023, reissued January 9, 2025) covers retrofit of windows, doors, garage doors and shutters on detached one- and two-family homes and townhouses with a mean roof height under 30 feet. The design pressure for each opening can be shown three ways:

Buildings 30 feet or taller need a sealed site-specific design by a Florida engineer or architect showing every retrofit opening and its pressure. Generic charts are not accepted above 30 feet.

  • A sealed site-specific plan.
  • An unsealed plan plus a sealed worst-case pressure chart.
  • An unsealed plan using the Broward County Fenestration Voluntary Wind Load Chart.

Pembroke Pines housing age against the code eras

Census aggregators put the median year a Pembroke Pines home was built at 1992, across roughly 67,000 housing units, with about 0.2 percent built before 1940. These are third-party summaries, so treat 1992 as an estimate and not a lookup for your own house.

Hurricane Andrew hit in 1992. The 1994 South Florida Building Code amendments that followed created the HVHZ approach, and the statewide Florida Building Code first took effect in 2002. A median of 1992 puts the typical home just before that change.

What the build year suggests about your windows (general pattern, check your own permit record)
When the home was builtCode in force thenWhat to check first
Before 1994Pre-Andrew South Florida Building CodeOriginal glass is unlikely to carry an impact approval. Look for a permit for past replacement.
1994 to 2002South Florida Building Code after the 1994 amendmentsFind the approval number and the permit date for any shutters or glass.
After 2002Florida Building Code, HVHZ provisions keptConfirm approvals still match the 8th Edition if you change anything.

The city's permit office and the Development HUB

The City of Pembroke Pines Building Department says installing fences, windows, doors or roofing requires a building permit. You apply with a general application and the required documents at the Building Division, 601 City Center Way, Pembroke Pines, FL 33025 (Broward County lists it as 601 SW City Center Boulevard). The phone is 954-435-6502.

Digital submittal runs through the Development HUB, on Tyler EnerGov since April 4, 2022. You must be a registered Contact in the HUB. After you submit, the permit number, status, fees and review comments appear on the permit application profile, and permit history back to 2009 is searchable.

The city publishes a Windows, Doors, Garage Doors, Skylights and Shutters Permit Checklist, revised 02/19/2026. It calls for two sets of plans and says submission can be done online. Broward's Uniform Retrofit Window and Door Schedule (BORA Policy 20-01) lists each opening's ID, approval number and required pressures. Fees are due at submittal and cash is not accepted.

Under Florida Statute 713.135(1)(e), when the direct contract is above the statutory threshold, the recorded Notice of Commencement must be filed before the first inspection. We did not find the city's window inspection sequence, so confirm it when you submit.

  1. Collect the approvals. Get the NOA or FL# for each product and confirm the HVHZ limits.
  2. Fill the retrofit schedule. List each opening, its approval number and required pressure.
  3. Register and submit. Create your HUB Contact profile and upload the checklist items.

HOAs, condos and recertification

Pembroke Pines requires every city building permit applicant to sign an affidavit acknowledging that if the property is in a homeowners' or condominium association, there may be association approval requirements. It is written into the Code of Ordinances. Ask your association before you order.

Condos add a safety layer. Florida Statute 553.899 requires milestone inspections of condominium buildings of three or more habitable stories. In Broward, BORA Policy 05-05 (effective August 9, 2024) replaced the old 40-year program: inspect at 25 years from the certificate of occupancy and every 10 years after, which also counts as state compliance. One- to four-family dwellings of three stories or fewer, fee-simple townhouses and buildings under 3,500 square feet are exempt.

We could not confirm which Pembroke Pines buildings are in the program. Ask your association.

Flood maps and storm history for an inland city

The city says updated FEMA flood maps for Broward County took effect July 31, 2024. A 2017 Climate Central report ranked Pembroke Pines third among US cities most vulnerable to major coastal flooding, even though the city is inland.

To learn your zone, call 954-518-9040 with your address or search Broward's FEMA map viewer. The zone decides whether flood insurance is mandated.

Wilma (October 24, 2005) brought estimated winds of 80 to 100 mph for about five hours to Broward, and more than 5,000 dwellings countywide were left uninhabitable. That is a county figure, not a Pembroke Pines count.

Before you ask for a written quote

Each Broward city runs its own permit office and portal, even though the county code is the same. If your address is inside Pembroke Pines, the Building Division above is your office.

Have your measurements, opening sizes, build year and any shutter details ready. SmartWay can turn those into a written quote at (754) 303-7130.

Pembroke Pines questions

Do I need a permit to replace windows in Pembroke Pines?
Yes. The city's Building Department says installing windows, doors, fences or roofing requires a building permit. You apply through the Building Division at 601 City Center Way or online through the Development HUB, and fees are due when you submit.
Is Pembroke Pines in the HVHZ?
Yes. The Florida Building Code defines the HVHZ as Broward and Dade counties, so the whole city is inside it. Windows and doors need a Miami-Dade NOA or a Florida Product Approval that lists the HVHZ in its limits of use.
What wind speed are windows designed for in Pembroke Pines?
For a typical house, the 2023 Florida Building Code uses a 170 mph three-second gust in Broward County (Risk Category II). The retrofit pressure for each opening comes from a plan, a sealed chart or the Broward wind load chart for buildings under 30 feet.
Can I use shutters instead of impact windows in Pembroke Pines?
The code accepts impact-tested glazing or an external protection device that meets the same tests. Shutters still need an NOA or FL# valid in the HVHZ and a permit.
Does my Pembroke Pines condo need association approval for new windows?
Probably. The city requires a permit affidavit noting that associations may have approval rules, and many boards control exterior changes. Ask your association before ordering, and send the approval number and drawing with your request.
Does the Broward 25-year inspection affect my windows?
It can for condo buildings. Buildings of three or more habitable stories are inspected at 25 years from the certificate of occupancy and every 10 years after, which counts toward the state milestone rule. Ask your association for its schedule.