Hurricane code · Sunrise · Broward County

Which hurricane code applies to windows in Sunrise, Florida?

Sunrise, Florida is in Broward County's High-Velocity Hurricane Zone even though it is inland, so replacement windows need a Miami-Dade NOA or an HVHZ-approved Florida Product Approval. Permits come from the City of Sunrise Building Division at 10770 W. Oakland Park Boulevard. Typical homes are designed for 170 mph gusts.

Last checked: November 3, 2026 · General information, not engineering or legal advice. Confirm requirements for your address with the building department.

Sunrise has no coast, and the strictest wind code still applies

Sunrise sits in central-western Broward County with no Atlantic or Intracoastal frontage. Many owners assume that means looser rules. It does not. Broward and Miami-Dade are the only two counties in Florida's High-Velocity Hurricane Zone (HVHZ), and the HVHZ provisions apply to an inland home on Oakland Park Boulevard exactly as they do to a beachfront one.

The code in force is the Florida Building Code, 8th Edition (2023), effective December 31, 2023. Section 1620.2 sets the design wind velocity for a typical Broward home (Risk Category II) at 170 mph, 3-second gust.

The 9th Edition (2026) is scheduled to take effect December 31, 2026, and permits applied for before then generally stay under the 8th Edition. Confirm the edition when you apply.

Broward guidance generally places land east of the Intracoastal in wind Exposure D, which the county's voluntary fenestration chart does not cover. Sunrise is well west of that band.

Sunrise ZIP codes and what to know about each area

Sunrise uses eight ZIP codes, and ZIP boundaries only loosely follow city limits.

Sunrise ZIP codes and window-code notes
ZIPArea noteWhat it means for windows
33351Home of the Amerant Bank Arena (Florida Panthers) and the city's Building DivisionSame HVHZ rules as the rest of Sunrise
33323Shared with Plantation (Plantation Acres)Check which city issues your permit; the address, not the ZIP, decides
33322Shared with Plantation's Mirror Lake and Lauderdale West areasSame check: confirm the city on your tax bill
33313, 33319, 33325, 33326, 33345Other Sunrise ZIPsAll Broward HVHZ; housing era varies by street

The City of Sunrise Building Division: where your window permit goes

Window and door permits in Sunrise come from the Building Division, part of Community Development, at 10770 W. Oakland Park Boulevard, Sunrise, FL 33351. The phone is (954) 572-2354 and the office is open 8:00 am to 4:00 pm.

The city lists windows, doors, shutters and garage doors among the structural items it handles through walk-through permitting for one- and two-family homes and townhouses, on Tuesdays and Thursdays from 8:00 to 10:00 AM. That list is the city's own signal that window work goes through a building permit.

Online filing runs through the Community Development Self-Service (CSS) Portal at sunrisefl.gov/openforbusiness, open 24/7. You create a dashboard and watch the permit status.

Questions go to askbuilding@sunrisefl.gov. Contractor registration and Notices of Commencement go to permits@sunrisefl.gov. Fees follow the city's Building Fee Schedule, plus county and state surcharges on some permits.

  • Where: 10770 W. Oakland Park Blvd, Sunrise, FL 33351
  • Phone: (954) 572-2354; main city line (954) 741-2580
  • Online: CSS Portal at sunrisefl.gov/openforbusiness
  • Walk-in: structural walk-through for one- and two-family homes and townhouses, Tuesday and Thursday, 8:00 to 10:00 AM

What a Sunrise window permit package has to show

We found no window-specific Sunrise checklist, so these items come from Broward rules that apply in every county city. Ask the Building Division about extras.

  1. Product approval. Each window or door needs a Miami-Dade Notice of Acceptance (NOA) or a Florida Product Approval (FL#) whose Limits of Use say it is approved for HVHZ use. Not every FL# is. The floridabuilding.org record is the check.
  2. Broward Uniform Retrofit Window & Door Schedule. Board of Rules and Appeals Policy 20-01 requires this schedule with every retrofit application. It lists each opening's ID, approval number, pressure rating, required design pressure, size, wind zone, glazing, shutters and mullions.
  3. Design pressure for each opening. Formal Interpretation #24 allows three routes: a sealed site-specific plan, an unsealed plan with a sealed worst-case chart, or an unsealed plan using the Broward Fenestration Voluntary Wind Load Chart.
  4. Notice of Commencement. When the contract is large enough to trigger Florida's lien-law threshold, a recorded copy, must be filed before the first inspection. In Sunrise that filing goes through permits@sunrisefl.gov.

Do you need a permit if the new window is the same size?

Some third-party permit sites say a same-size swap is exempt in Sunrise. They are not official. The city's own walk-through list names windows and doors, and the Broward retrofit rules apply countywide, so plan on a permit. If you want a definite answer for your address, call the Building Division at (954) 572-2354 before you order anything.

We could not confirm a Sunrise owner-builder form or rule, so we do not describe one here.

Condos over 30 feet and the rule that changes the paperwork

Formal Interpretation #24 covers detached one- and two-family homes and townhouses with a roof height under 30 feet. Above a mean roof height of 30 feet, wind loads must be site-specific and signed and sealed by a Florida engineer or architect. Generic charts are not accepted.

In Sunrise that mostly touches mid-rise condominium buildings, not one-story ranch homes.

A 1982 median home: most of Sunrise was built before the modern code

The Census Bureau's 2023 American Community Survey puts Sunrise's median year built at 1982, across 41,063 housing units. The 1970s is the biggest build decade, with roughly 15,000 dwellings counted in that decade.

Sunrise was incorporated in 1961 as Sunrise Golf Village, on 2,650 acres at the then-remote western edge of Broward. Developer Norman Johnson drew buyers with an upside-down model home on Sunset Strip, demolished in 1975.

Sunrise housing eras and the code behind them
BuiltCode behind itWhat to expect in the openings
Before 1994Before the post-Andrew South Florida Building Code amendmentsOriginal windows were not tested for missile impact; this covers most of the 1970s peak
1994 to 2001South Florida Building CodeStricter than before, but may predate current NOA and FL# testing
2002 onwardStatewide Florida Building Code, with HVHZ kept for BrowardFew homes; the newest era is the smallest in the city

What Wilma and Irma did in Sunrise

Hurricane Wilma came ashore as a Category 3 on October 24, 2005. Roof damage and power loss at what was then the BankAtlantic Center in Sunrise forced the Florida Panthers to postpone their October 29 game. Accounts describe the strongest back-side gusts hitting western Broward suburbs including Sunrise and Weston.

Hurricane Andrew in 1992 led to the statewide Florida Building Code, first effective in 2002, which kept the stricter HVHZ rules for Miami-Dade and Broward.

Condo buildings: milestone inspections and the Broward 25-year rule

Florida's milestone law (s. 553.899, F.S.) covers condominium and cooperative buildings three stories or taller. The first inspection is due by December 31 of the year the building reaches 30 years from its certificate of occupancy, then every 10 years.

Broward's Building Safety Inspection Program (BORA Policy 05-05, revised effective August 9, 2024) also asks for structural and electrical inspection of non-exempt buildings once they reach 25 years, then every 10 years. One- and two-family homes and fee-simple townhouses are exempt. Sunrise condo buildings from the 1970s and 1980s are well past that age.

Many Sunrise communities are governed by an HOA or condo association. We could not confirm that the city requires an association letter, but approval is commonly needed before you apply, so ask your board first.

Flood zone and the insurance paperwork

The City of Sunrise says roughly 90% of the city is in FEMA zones C or X, minimal flood hazard areas. Updated FEMA maps for Broward took effect July 31, 2024. For a specific parcel, call (954) 888-6011.

A wind mitigation inspection on form OIR-B1-1802 can document impact windows or shutters for your insurer.

Bordering cities

Sunrise borders Plantation to the east and south, Weston to the southwest, and Lauderhill, Lauderdale Lakes, North Lauderdale and Tamarac. Each runs its own permit office.

Sunrise questions

Do I need a permit to replace windows in Sunrise?
Plan on one. The City of Sunrise lists windows, doors, shutters and garage doors among the structural items it permits, and Broward's retrofit rules apply countywide. Call (954) 572-2354 to confirm for your address.
Is Sunrise in the HVHZ?
Yes. Sunrise is in Broward County, and Broward and Miami-Dade are Florida's two High-Velocity Hurricane Zone counties. Being inland does not exempt it.
What wind speed are windows designed for in Sunrise?
FBC Section 1620.2 sets Risk Category II buildings in Broward at 170 mph, 3-second gust. Each opening gets its own design pressure by height and wall zone.
Can I use shutters instead of impact windows in Sunrise?
Yes, as an option. The Broward retrofit schedule lists shutters alongside impact glazing. They still need product approval and a permit.
Does my Sunrise condo need association approval for new windows?
Usually, yes. Many Sunrise communities are condo or HOA governed, and approval is commonly needed before you apply. We could not confirm a city rule requiring the letter, so ask your board and the Building Division.
Does Sunrise's 25-year inspection affect my condo windows?
It can. Broward's inspection program covers non-exempt buildings 25 years or older, then every 10 years, and Florida's milestone law covers condo buildings of three stories or more. Many 1970s and 1980s Sunrise buildings are in range, so ask your association for its schedule.