Hurricane code · Hillsboro Beach · Broward County
Hurricane Window Code in Hillsboro Beach, FL
Hillsboro Beach windows follow Broward's High-Velocity Hurricane Zone rules at 170 mph, but the permit comes from the town's own Building Department at 1210 Hillsboro Mile. The town adds a sea turtle form for windows seen from the beach, requires a permit for any shutter, and its posted wind chart does not cover Exposure D coastal sites.
Last checked: November 18, 2026 · General information, not engineering or legal advice. Confirm requirements for your address with the building department.
Who issues a window permit on Hillsboro Mile?
The Town of Hillsboro Beach does. It is a small barrier-island town with its own Building Department inside Town Hall at 1210 Hillsboro Mile. The office is open 7:30 AM to 4:00 PM, Monday through Friday, and the phone is (954) 427-4011. Broward County does not issue the permit, and neither do Deerfield Beach or Pompano Beach next door.
Applications go through the town's Community Core portal. The town says it accepts digital submittal of all permit types and works them in the order received. After plan review, fees are assessed by email. Once you pay, you download the permit. Window and door permit packages may be printed on regular letter paper for the inspector, while other jobs need 11x17 sheets.
Work hours are short. Under Ordinance 2020-04, construction runs 8:00 AM to 6:00 PM on weekdays only, with no work on six major holidays. Plan the work around that.
Why the town asks about sea turtles on a window permit
Every town resident fills out the Window and Door Replacement form. Its first question is simple: can any part of your unit be seen from the beach?
If yes, the form asks whether the new windows are tinted to a shading (SC) rating of .45 or less. If they are not, lights inside must be screened by blackout drapes, shade screens, verticals or blinds on beach-facing windows, or turned off from sundown to sunup during nesting season, March 1 through October 31. The owner and the contractor both sign it.
This is the choice most oceanfront owners face. Tinted impact glass handles the rule once. Clear glass means living with window treatments every nesting season. Ask for the glass build and its shading (SC) rating in writing before you order.
Shutters and balconies: two lines in the town code
Town Code Section 12-262(B) covers balcony enclosures. It says installing any hurricane shutters or storm paneling requires a building permit from the Town of Hillsboro Beach.
The same section bans enclosing balconies above the first floor that stick out past the building face. Glass, sliding doors and other enclosures are listed by name. So a tower owner can replace the slider between the living room and the balcony, but cannot add a new wall of glass at the balcony rail to make a room.
The town's window sheet ties the two together. If a new window or door has no impact rating, you need a shutter permit with a valid product approval, or the permit number of the existing shutter.
170 mph is the same as Broward. The exposure is not.
Broward County is in the Florida Building Code's High-Velocity Hurricane Zone, and Section 1620.2 sets 170 mph for typical buildings (Risk Category II). That part matches every other Broward town.
What changes on this island is exposure, which tells the engineer how rough the ground is upwind. The code calls open water Surface Roughness D. Exposure D applies where that water runs upwind for at least 5,000 feet, and also within 600 feet, or 20 times the building's height, of that condition. Exposure D means higher pressures on the same window than Exposure C.
Here is the local catch. The wind load chart posted on the town's forms page is built for 170 mph and Exposure C, and it says in plain words that it is not for use in coastal Exposure D areas. It also only covers houses and townhouses with a roof under 30 feet. For an oceanfront estate or a tower, expect design pressures from a Florida engineer or architect, not the chart.
- Oceanfront lots face the Atlantic directly, the textbook Exposure D case.
- Intracoastal-side lots on a narrow island may still fall inside the 600-foot or 20-times-height reach. The engineer of record decides, lot by lot.
- The posted chart is labeled for the 2017 code and Broward Formal Interpretation #5. Broward's newer Interpretation #24 also sends buildings over 30 feet to a sealed site-specific design. Ask the town which chart it accepts today.
Towers and estates: two kinds of window job
Hillsboro Beach is mostly condos. Census data for 2020 to 2024 counts 2,685 housing units in town. About 1,806 of them, two in three, are in buildings with 50 or more units. Only 198 are detached houses. The median home was built in 1974, and about 72% were built before 1980, well before Broward's post-Andrew rules.
The town's zoning shows why. Single-family lots are zoned RS-2. Multifamily districts allow 3 or 7 stories, and the coastal dune district allows up to 10 stories and 130 feet east of A1A.
| Type | Share of homes | Code question to ask |
|---|---|---|
| Condo units in 50+ unit buildings | About 67% | Who owns the window: you or the association? Engineer-sealed pressures for a tall, ocean-facing wall |
| Units in 10 to 49 unit buildings | About 21% | Over 30 feet tall? Then the county chart does not apply |
| Detached single-family estates (RS-2) | About 7% | Ocean or Intracoastal side? Exposure D, VE zone and turtle glass on the beach side |
| Townhouses and small buildings | About 5% | Roof under 30 feet and Exposure C? Only then can the chart be used |
VE on the beach side, AE on the bay side
We sampled FEMA's National Flood Hazard Layer across the island on November 18, 2026. Points on the ocean side were Zone VE, the coastal high hazard zone, with base flood elevations of 13 to 15 feet. Points on the Intracoastal side were Zone AE at 7 feet. Some points in the middle, including the Town Hall point, were Zone X. Look up your own parcel.
Note the dates. The town's flood map page still describes the 2014 maps, but new Broward FEMA maps took effect July 31, 2024. Under the town's Ordinance 266, a building whose repair cost tops 50% of market value must be brought up to flood and current code rules, so a window job inside a big remodel can trigger more.
Oceanfront parcels also sit near Florida's Coastal Construction Control Line. The state DEP program sets special siting and design rules seaward of that line to protect the beach, dunes and turtles, and the town's forms page links it. Ask the town and DEP whether your job needs anything extra.
Milestone inspections and reserve studies for the towers
Florida's condo building safety laws reach almost every tower here. Under Statute 553.899, condo buildings three habitable stories or more need a milestone inspection by the end of the year they turn 30, then every 10 years. A local agency may set 25 years for buildings near salt water. Broward's own safety inspection program already begins at 25 years; the town's fee schedule still calls it the 40-year program.
Windows matter in the reserve study too. Statute 718.112 makes associations study each building of three or more habitable stories at least every 10 years, and windows and exterior doors are on the required list. That study is often how a board decides when the whole building's windows will change.
What the town's window sheet asks for
- Application and turtle form. Building application with lot, block, subdivision and job value, plus the Window and Door Replacement form.
- Product approvals. Two copies of current Miami-Dade NOA or Florida approvals, with components, connections and anchors highlighted.
- Schedule and survey. Two copies of the Broward retrofit window and door schedule, and a survey marking the work and every bedroom.
- Egress. Bedrooms need an egress opening if the existing one is big enough, with the latch no higher than 54 inches.
- New size or location. Add two sets of drawings signed and sealed by an engineer or architect.
- Condo owners. An HOA Affidavit or association letter. The town's condo remodel checklist says in-person submittal only, so confirm the route for a window job.
Before you ask for a written quote
- Your address, flood zone and whether your unit can be seen from the beach.
- Ocean side or Intracoastal side, and your building's height.
- Your association's window rules and who owns the openings.
- Width, height and type of each opening.
- After the job, a wind mitigation inspection on form OIR-B1-1802 can document opening protection for your insurer.
- Questions? Call (754) 303-7130 or send your measurements for a written quote.
Hillsboro Beach questions
Does Hillsboro Beach have its own building department?
Do Hillsboro Beach windows need tinted glass for sea turtles?
Do I need a permit for hurricane shutters in Hillsboro Beach?
Can I use the Broward wind load chart for my oceanfront home?
Can I enclose my condo balcony with impact glass in Hillsboro Beach?
What flood zone is a Hillsboro Beach home in?
Sources
- Town of Hillsboro Beach - Building Department
- Town of Hillsboro Beach - Online Permit Submittal
- Town of Hillsboro Beach - Building Applications & Forms
- Town of Hillsboro Beach - Window and Door Replacement Form
- Town of Hillsboro Beach - Window & Door Requirements
- Town of Hillsboro Beach - Wind Load Chart
- Town of Hillsboro Beach - Condo Remodel Submittal Checklist
- Town of Hillsboro Beach - Flood Map
- Town of Hillsboro Beach - Permits & Regulations (floodplain)
- Town of Hillsboro Beach Code Sec. 12-262 (Zoneomics mirror)
- Town of Hillsboro Beach Code Sec. 12-100 zoning districts (Zoneomics mirror)
- Florida Building Code 2023, Chapter 16 (UpCodes)
- FIU Facilities - Wind Velocity Tables (FBC 1620.2)
- FEMA National Flood Hazard Layer
- Florida DEP - Coastal Construction Control Line
- Florida Statutes s. 553.899 (milestone inspections)
- Florida Statutes s. 718.112 (structural integrity reserve study)
- Broward BORA Policy 05-05 amendments
- U.S. Census Bureau ACS 2024 5-year (via Census Reporter)